Kitchen Remodeling in North Jersey
The kitchen is the room a household cannot do without, so a kitchen remodel is as much about sequencing as it is about finishes. HC Reliable Construction plans kitchen projects in North Jersey so the disruptive work happens in a predictable order and the space comes back together on schedule.
We work on everything from cabinet and counter replacement to layout changes that open the kitchen to adjacent living space.
Common problems we solve
- Cabinets that are structurally tired, poorly laid out or short on storage
- Counters and backsplash that are worn, dated or difficult to keep clean
- Closed-off kitchens that feel cut off from the rest of the first floor
- Flooring that has been patched around appliances over the years
- Lighting that leaves work surfaces in shadow
What is included
- Demolition and removal of existing cabinets, counters and flooring
- Cabinet installation, including islands and pantry units
- Countertop and backsplash coordination and installation
- Flooring installation
- Drywall repair, trim, and interior painting
- Coordination with licensed electrical and plumbing trades for rough-ins and hookups
Our process
- Kitchen walk-through: We review the layout, storage needs and what stays or goes.
- Scope and estimate: A written scope covering cabinetry, surfaces, flooring and trades.
- Ordering: Cabinets and surfaces confirmed and ordered before demolition to limit downtime.
- Demolition and rough work: Old finishes removed, walls repaired, trades rough in.
- Install: Cabinets set, counters templated and installed, backsplash and flooring completed.
- Finish and review: Trim, paint, hardware, then a walk-through and punch list.
Frequently asked questions
Can I use my kitchen during the remodel?
Usually only partially. We tell you at the estimate stage which phases will take the kitchen out of service.
Do you move walls to open up the kitchen?
Layout changes are possible depending on structure. Anything structural is reviewed carefully before it is quoted.
Who orders the cabinets?
Either of us can, as long as it is agreed up front so the schedule accounts for lead times.
What causes kitchen projects to run long?
Most often material lead times and conditions found behind old cabinets. We flag both as early as we can.